some-alt
Main News Press Releases Energy workers of DTEK Odesa Grids restored electricity to almost 400,000 families, left without power supply after an enemy attack

Energy workers of DTEK Odesa Grids restored electricity to almost 400,000 families, left without power supply after an enemy attack

Thermal power generation27 August 2024
On August 27, DTEK restored electricity to homes of almost 400,000 families in the Odesa region that were de-energized due to an enemy attack. Energy workers of DTEK Odesa Grids repair lines and electrical equipment, destroyed by the enemy, immediately after receiving permission from the military command and emergency service. Our goal is to provide towns and villages with electricity, required for normal life of residents of the region.
Energy workers of DTEK Odesa Grids restored electricity to almost 400,000 families, left without power supply after an enemy attack

In the morning of August 26, Odesa region was hit by yet another enemy attacks that damaged DTEK Odesa Grids power lines and de-energized 378,000 families 

 

DTEK energy workers immediately commenced emergency and restoration activities once they obtained permission from the military command and emergency service. As of August 27, electricity has been restored to all families. Repairs are ongoing. 

 

Since the beginning of the full-scale war, energy workers of DTEK Odesa Grids restored power to a total of more than 844,000 customers*, de-energized due to enemy attacks. 

 

Let us remind that in case of a sudden blackout, it may be caused by an emergency on the intra-building networks or our distribution grids. 

 

In order to inform about an emergency, please check if the emergency at your address has already been registered on our website. If no, please inform us about the power outage in any convenient manner: 

  • via private messages on DTEK Odesa Grids Facebook; 
  • via call center telephone numbers: mobile +38 (068/095/073) 750 90 90 or stationary +38 (048) 705 90 90. 

 

We are working 24/7 to ensure reliable power supply of buildings and enterprises. 

*excluding periods of application of emergency and stabilization shutdowns schedules 

25 March 2026
Thermal power generation DTEK Dnipro Grids energy workers restored electricity to 39 settlements, affected by the strikes
25 March 2026
Thermal power generation The youth chooses energy industry: 50 more students have joined the dual education program of the DTEK Grids DSO
24 March 2026
Thermal power generation DTEK Grids DSO are speeding up installation of smart meters: more than third of all customers have already received it
23 March 2026
Thermal power generation DTEK Grids presented its experience in bird protection at the “Free Sky for Birds 2026” international conference
23 March 2026
Thermal power generation DTEK Grids DSO restored electricity to more than 807,000 homes in four regions over the course of the week
20 March 2026
Thermal power generation Attacks on the power facilities: over the course of the day, DTEK Dnipro Grids energy workers restored electricity to 85 settlements in the region
18 March 2026
Thermal power generation 2025 Eco Summary of DTEK Kyiv Regional Grids: ISO 14001, decarbonization and responsible waste management
18 March 2026
Thermal power generation In the Dnipropetrovsk region, russians have once again attacked DTEK Dnipro Grids energy workers’ vehicle with drones
18 March 2026
Thermal power generation 2025 Eco Summary of DTEK Grids DSO: ISO 14001, decarbonization and over 2,000 tons of waste to recycling
17 March 2026
Thermal power generation Partners’ aid: DTEK Dnipro Grids received 4 transformers for restoration of energy equipment after the strikes