some-alt
Main News Press Releases DTEK Kyiv Regional Grids makes submission of readings easier

DTEK Kyiv Regional Grids makes submission of readings easier

DTEK Kyiv Regional Grids offers three services to submit electricity meter readings yourself in a matter of minutes. All these services are available 24/7, simple and user-friendly. Residents of the Kyiv region have time until May 3 to timely submit meter readings – and, thus, avoid discrepancies in charging and be billed for the actually consumed electricity only.

Meter readings are to be submitted during the period from the last 2 days of the current month until the 3rd day of the next one. After that, the Distribution System Operator provides volume of electricity consumed by you to the electricity supplier for billing. If you submit meter readings on the 4th day of the month or later, then the legislation requires DSO to estimate data based on the average daily consumption of the similar period last year. 

Let us remind you about the three online services of DTEK Kyiv Regional Grids that you can use to provide us with your meter’s data: 

  • Viber and Telegram chatbot is the fastest and most convenient way. EnterDTEK Kyiv Regional Gridsin the search bar of your messenger, pass the verification procedure (for unauthorized customers) and select “Submit Meter Readings” in the menu. 
  • There is a special web form on the DTEK Kyiv Regional Grids website that does not require registration. 
  • In addition to submission of readings, personal user account provides the history of previously submitted readings and consumption volumes. 

For your consumption volume to be the real and not the estimated one, please submit readings to us in time. 

 

24 March 2026
Thermal power generation DTEK Grids DSO are speeding up installation of smart meters: more than third of all customers have already received it
23 March 2026
Thermal power generation DTEK Grids presented its experience in bird protection at the “Free Sky for Birds 2026” international conference
23 March 2026
Thermal power generation DTEK Grids DSO restored electricity to more than 807,000 homes in four regions over the course of the week
20 March 2026
Thermal power generation Attacks on the power facilities: over the course of the day, DTEK Dnipro Grids energy workers restored electricity to 85 settlements in the region
18 March 2026
Thermal power generation 2025 Eco Summary of DTEK Kyiv Regional Grids: ISO 14001, decarbonization and responsible waste management
18 March 2026
Thermal power generation In the Dnipropetrovsk region, russians have once again attacked DTEK Dnipro Grids energy workers’ vehicle with drones
18 March 2026
Thermal power generation 2025 Eco Summary of DTEK Grids DSO: ISO 14001, decarbonization and over 2,000 tons of waste to recycling
17 March 2026
Thermal power generation Partners’ aid: DTEK Dnipro Grids received 4 transformers for restoration of energy equipment after the strikes
16 March 2026
Thermal power generation Restoring electricity after the strikes: energy workers of DTEK Kyiv Regional Grids restored power supply to more than 52,000 homes over the course of the week
16 March 2026
Thermal power generation Over the course of the week, DTEK Dnipro Grids restored electricity to 78,500 homes in the Dnipropetrovsk region after the attacks