some-alt
Main News Press Releases Massive strikes on the energy sector: DTEK Dnipro Grids restored electricity to 1.1 mln families over the course of the week

Massive strikes on the energy sector: DTEK Dnipro Grids restored electricity to 1.1 mln families over the course of the week

Thermal power generation12 January 2026
From January 5 to 11, DTEK Dnipro Grids emergency crews restored electricity to more than 1.1 mln families, left without power supplier due to enemy attacks on power facilities. Some residents had electricity restored to them on two or more occasions. Energy workers repair damaged lines and electrical equipment immediately after obtaining permission from the AFU and SES. Our goal is to provide towns and villages with electricity, required for the normal life of the region’s residents.
Massive strikes on the energy sector: DTEK Dnipro Grids restored electricity to 1.1 mln families over the course of the week

Over the course of the week, the enemy launched massive attacks on the energy infrastructure of the Dnipropetrovsk region, targeting main distribution grids and a number of power facilities, in Dnipro and Kryvyi Rih in particular. Emergency crews commenced work immediately after obtaining permission from the military and the SES. 

From January 5 to 11, despite the difficult security situation and unfavorable weather conditions, DTEK Dnipro Grids specialists restored power supply to 1,144,854 families after numerous russian attacks. Over the weekend alone, energy workers restored electricity to almost 103,000 residents of the region. 

“Despite all difficulties, we have restored power supply to the majority of consumers in the Dnipropetrovsk region after a series of massive rf’s attacks. The majority of the region is already working in accordance with the usual stabilization schedules. Meanwhile, the situation on the left bank of Dnipro and in the Dnipro district after an attack on the power facility on the night from Friday to Saturday remains difficult ‒ the scale of damages does not yet allow to completely restore electricity to everyone. Over 18,000 families currently remain de-energized. Together with city authorities, we are searching for alternative power supply solutions and are doing everything possible to complete repairs and restore electricity to homes as soon as possible,” ‒ commented DTEK Dnipro Grids CEO Andrii Tereshchuk. 

Restoration activities in the frontline zone are complicated by constant shelling. Nevertheless, energy workers are doing everything possible to restore electricity to residents’ homes as soon as possible. 

To contact the company please use official information channels only. Our specialists are ready to process your applications via remote service channels: websitesocial mediaViber and Telegram chatbots. 

We are working 24/7 to ensure a reliable power supply to houses and enterprises. 

03 September 2026
Thermal power generation Enemy drone attacked DTEK Dnipro Grids station in the Dnipropetrovsk region
02 September 2026
Thermal power generation Over the course of the day, energy workers of DTEK Kyiv Regional Grids restored electricity to more than 3,600 families after the attacks
01 September 2026
Thermal power generation Restoring electricity after the strikes: DTEK Grids DSO restored electricity to almost 4.5 mln homes in August
31 August 2026
Thermal power generation Three power facilities of DTEK Dnipro Grids attacked in the Dnipropetrovsk region
31 August 2026
Thermal power generation The President and the Cabinet of Ministers honoured six energy workers of DTEK Grids DSO for their contribution to the sustainability of the Ukrainian energy system
26 August 2026
Thermal power generation Storks settled in 88% of nests on protective platforms: DTEK Dnipro Grids summed up the results of monitoring
25 August 2026
Thermal power generation Over the course of the week, DTEK Grids DSO restored electricity to almost 600 settlements, de-energized by the attacks
21 August 2026
Thermal power generation 44 educational institutions and 475 students: how DTEK Grids DSO train future energy workers
17 August 2026
Thermal power generation DTEK Grids DSO restored electricity to 900,000 homes in three regions over the course of the week
14 August 2026
Thermal power generation More than 2,700 green and distributed power generation facilities were connected over the course of six months, – DTEK Grids