some-alt
Main News Press Releases DTEK Grids DSO restored electricity to 106,700 homes in Donetsk, Dnipropetrovsk and Odesa regions over the course of the week

DTEK Grids DSO restored electricity to 106,700 homes in Donetsk, Dnipropetrovsk and Odesa regions over the course of the week

From May 5 to 11, energy workers of the DTEK Grids Distribution System Operators (DSO) managed to completely or partially restore power to 49 settlements, de-energized due to enemy shelling, thus restoring electricity to homes of 106,700 families in Donetsk, Dnipropetrovsk and Odesa regions. Specialists of the DTEK Grids Distribution System Operators commence repairs of grids and equipment immediately after obtaining permission from the AFU and the SES.

Last week, energy workers continued to eliminate consequences of enemy attacks on Ukrainian towns and villages. The majority – in the Donetsk region, which remains the region of the most active hostilities. Despite constant danger, energy workers here managed to restore power to homes of 83,400 families.  

Dnipropetrovsk region also frequently suffers from enemy shelling that causes power outages for the families. From May 5 to 11, energy workers were able to restore electricity to 22,500 homes of local residents. 

Over the past seven days, Odesa region suffered enemy attacks too. During this period, our specialists managed to restore electricity to 759 families of local residents. 

“The enemy continues to attack our country. Energy workers continue to hold the energy front and eliminate consequences of shelling for 1,174 days now. Since the beginning of the full-scale invasion, we have already restored electricity to 18.8 mln* families in Kyiv, Dnipropetrovsk, Odesa and Donetsk regions, and in the city of Kyiv. Some settlements close to the area of hostilities had electricity restored to them on dozens of occasions,” – noted Alina Bondarenko, CEO at DTEK Grids.  

Energy workers of DTEK Grids are doing everything possible to eliminate damage as soon as possible. They commence work immediately after obtaining permission and access to the site of damage from the AFU and SES. 

* considering that some customers had electricity restored to them on dozens of occasions. 

14 August 2026
Thermal power generation More than 2,700 green and distributed power generation facilities were connected over the course of six months, – DTEK Grids
13 August 2026
Thermal power generation 37 upgraded power facilities over six months: DTEK Grids DSO increased volumes of reconstruction and construction by 1.5 times
12 August 2026
Thermal power generation Energy workers of DTEK Dnipro Grids restored electricity to more than 26,000 families in the Dnipropetrovsk region over the course of two days
10 August 2026
Thermal power generation DTEK Grids DSO restored electricity to more than 1.2 mln homes in Donetsk, Odesa and Dnipropetrovsk regions over the course of the week
10 August 2026
Thermal power generation Electricity restored to almost 140,000 families in the Kyiv region: energy workers of DTEK Kyiv Regional Grids completed the restoration of the main grid after severe weather
07 August 2026
Thermal power generation In the first half of 2026, DTEK Grids DSO sent 777 tons of waste for recycling
05 August 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids power facilities: 126,000 residents of the Dnipropetrovsk region were left without electricity
04 August 2026
Thermal power generation Over the course of six months, DTEK Grids DSO restored 240 power facilities, damaged during hostilities
03 August 2026
Thermal power generation From platforms for nests to GPS trackers: DTEK Dnipro Grids began live tracking of stork migration
29 July 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids unit in the Dnipropetrovsk region with a fibre optic drone