some-alt
Main News Press Releases DTEK Grids DSO will take care of your employees’ safety

DTEK Grids DSO will take care of your employees’ safety

DTEK Grids Distribution System Operators perform inspection of tools, systems and protection equipment for legal customers. In 2024 alone, specialists helped ensure safe working conditions for 130 companies in the capital, as well as in Kyiv, Odesa and Dnipropetrovsk regions. From now on, our services are united into package offers, allowing to optimize costs and plan inspections in advance.
DTEK Grids DSO will take care of your employees’ safety

DTEK Grids Distribution System Operators offer those who deal with the grids in their work, package offers for inspection of relay protection and automation (RPA) equipment and testing of tools and personal protection equipment (PPE). Timely performed RPA inspections will ensure reliable protection of electrical installations from emergencies, while testing of tools and PPE helps improve safety of the employees at their workstations and avoid penalties for violating the occupational safety regulations. 

The following packages are currently available: 

  • Testing of tools insulation under the increased voltage (electric drill, electric screwdriver, circular saw, screwdrivers, wrenches, pliers, etc.).
  • Testing of electrical protective equipment (insulating tongs, voltage indicator, dielectric rubber gloves, bots, 8 pairs of rubber shoes, measuring rod).
  • Post-emergency inspection of relay protection, 6-10kV power lines automation, relay automation, Automatic Transfer Switch (ATS) / Automatic Reserve Input (ARI) device.

Every package is a set of services, available for one year. For example, the tools inspection package includes 20 tests. Upon customer’s request, we can inspect all tools at once or in parts over the course of the year. This is an optimal solution for the company that has several crews. 

Additionally, you can deliver the tools by means of a Nova Poshta courier, thus saving time for arrangement of transportation. 

You can order a services package in a few clicks on the website: 

We will help keep electrical safety under control. 

14 August 2026
Thermal power generation More than 2,700 green and distributed power generation facilities were connected over the course of six months, – DTEK Grids
13 August 2026
Thermal power generation 37 upgraded power facilities over six months: DTEK Grids DSO increased volumes of reconstruction and construction by 1.5 times
12 August 2026
Thermal power generation Energy workers of DTEK Dnipro Grids restored electricity to more than 26,000 families in the Dnipropetrovsk region over the course of two days
10 August 2026
Thermal power generation DTEK Grids DSO restored electricity to more than 1.2 mln homes in Donetsk, Odesa and Dnipropetrovsk regions over the course of the week
10 August 2026
Thermal power generation Electricity restored to almost 140,000 families in the Kyiv region: energy workers of DTEK Kyiv Regional Grids completed the restoration of the main grid after severe weather
07 August 2026
Thermal power generation In the first half of 2026, DTEK Grids DSO sent 777 tons of waste for recycling
05 August 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids power facilities: 126,000 residents of the Dnipropetrovsk region were left without electricity
04 August 2026
Thermal power generation Over the course of six months, DTEK Grids DSO restored 240 power facilities, damaged during hostilities
03 August 2026
Thermal power generation From platforms for nests to GPS trackers: DTEK Dnipro Grids began live tracking of stork migration
29 July 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids unit in the Dnipropetrovsk region with a fibre optic drone