What should be done with the electricity meter during home renovation, – tells DTEK Dnipro Grids

To relocate or reconnect the electricity meter, it must be unsealed. The seal is a guarantee of the meter integrity and its correct maintenance by the energy company. Therefore, in accordance with the legislation, only DTEK Dnipro Grids is authorized to remove it. Besides, attempting to disconnect the meter by yourself may cause short circuit or malfunctions.
When do you need to unseal the meter?
- When you change the wiring and there is a need to reconnect the meter.
- When you replace a circuit breaker located before the meter.
- When the meter itself needs to be relocated: energy workers will unseal the device, and you will be able to relocate it in accordance with the design documentation.
After completion of renovation, the energy company must seal the meter again and confirm its operability. If you will manage to complete the required repairs within 10 minutes, our energy workers may perform unsealing and sealing within a day. In this case, electricity will remain available in your home. If these requests will be processed on different dates, then without a seal there will be no electricity.
To order the meter sealing services, please:
- follow the link,
- enter your personal account (it is available in the distribution agreement or in the contact center),
- select “Meter Sealing”, and then – “Unsealing/sealing to conduct repairs”.