some-alt
Main News Press Releases Light despite the attacks: how Odesa region went through the 2024/25 heating season

Light despite the attacks: how Odesa region went through the 2024/25 heating season

Despite the war and massive enemy attacks on the power facilities, residents of the Kyiv region went through the heating season with electricity. This was achieved due to the systematic preparation for winter, automation of processes and coordinated work of the DTEK Odesa Grids energy workers. The total amount invested in repairs and development of the grids is almost UAH 1.3 bln.
Light despite the attacks: how Odesa region went through the 2024/25 heating season

Over the past year, DTEK Odesa Grids invested almost 1.3 bln hryvnias in reconstruction and construction of power facilities. In particular, the Distribution System Operator built and repaired over 1,600 km of overhead and cable lines, upgraded 1,200 power facilities, cleared over 2,100 km of power line routes from branches and drywood, as well as created an emergency stock of fuel and materials. Due to these large-scale activities, energy workers were able to prepare for the autumn-winter period in a quality manner and provide electricity to homes of Odesans and residents of the region. 

“We understand the importance of reliable power supply for the residents of the Odesa region. Therefore, despite the challenges of war, we direct all resources to enhancement of the grids in order to fulfil the region’s need in sustainable and reliable energy system. In 2025, we plan to repair 2,200 kilometers of the overhead lines, upgrade 848 power facilities, install over 60,000 smart meters. The amount invested in repairs and development of the grids in 2025 is UAH 1.4 bln,” — noted Dmytro Hryhoriev, CEO at DTEK Odesa Grids. 

Light despite the attacks: how Odesa region went through the 2024/25 heating season

Throughout winter, the enemy continued attacking the energy sector of the Odesa region. Specialists have restored electricity to homes of 1 million families. Seven large power facilities of DTEK Odesa Grids suffered significant destruction, repair activities are still ongoing there. 

Energy workers’ efforts to restore electricity during the heating season were highly valued by the state – 164 energy workers of the company received state and industrial awards, as well as certificates and letters of gratitude from local authorities. 

The company continues to develop remote services, with Viber and Telegram chatbots being the most popular ones. 86% of our customers have already used them. Chatbot can help submit meter readings, get notification about emergency outages or scheduled shutdowns, file a request about lack of electricity 

DTEK Odesa Grids recommends its customers to only use official channels to get reliable information about the company – website, chatbot, company’s Facebook page and trust verified information. 

14 August 2026
Thermal power generation More than 2,700 green and distributed power generation facilities were connected over the course of six months, – DTEK Grids
13 August 2026
Thermal power generation 37 upgraded power facilities over six months: DTEK Grids DSO increased volumes of reconstruction and construction by 1.5 times
12 August 2026
Thermal power generation Energy workers of DTEK Dnipro Grids restored electricity to more than 26,000 families in the Dnipropetrovsk region over the course of two days
10 August 2026
Thermal power generation DTEK Grids DSO restored electricity to more than 1.2 mln homes in Donetsk, Odesa and Dnipropetrovsk regions over the course of the week
10 August 2026
Thermal power generation Electricity restored to almost 140,000 families in the Kyiv region: energy workers of DTEK Kyiv Regional Grids completed the restoration of the main grid after severe weather
07 August 2026
Thermal power generation In the first half of 2026, DTEK Grids DSO sent 777 tons of waste for recycling
05 August 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids power facilities: 126,000 residents of the Dnipropetrovsk region were left without electricity
04 August 2026
Thermal power generation Over the course of six months, DTEK Grids DSO restored 240 power facilities, damaged during hostilities
03 August 2026
Thermal power generation From platforms for nests to GPS trackers: DTEK Dnipro Grids began live tracking of stork migration
29 July 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids unit in the Dnipropetrovsk region with a fibre optic drone