some-alt
Main News Press Releases DTEK energy workers restored electricity after shelling to 1,900 families in the Dnipropetrovsk region over the course of the day

DTEK energy workers restored electricity after shelling to 1,900 families in the Dnipropetrovsk region over the course of the day

Thermal power generation25 December 2024
On December 24, DTEK Dnipro Grids restored power to homes of 1,900 families that were left without electricity due to the shelling. Despite the threats, specialists continue to repair the grids upon permission of the Armed Forces of Ukraine and SES. Our goal is to provide towns and villages with electricity, required for normal life of region’s residents.
DTEK energy workers restored electricity after shelling to 1,900 families in the Dnipropetrovsk region over the course of the day

Dnipropetrovsk region continues to suffer from russian shelling that destroys electrical infrastructure of towns and villages in particular. The most difficult situation remains in the south of the region, which the enemy attacks daily from the occupied territories.

Yesterday, DTEK Dnipro Grids specialists restored power to 1,917 homes in 5 settlements, de-energized due to hostilities.

Energy workers are doing everything possible to eliminate damage as soon as possible. The works are commenced immediately after obtaining permission and access to the site of damage from the AFU and the State Emergency Service of Ukraine.

Nearly 140 families currently remain without electricity. Energy workers are working to energize them as soon as possible.

To contact the company, please use official information channels only. Our specialists are ready to process your applications via remote service channels: website, social networks, contact center +38 (056/066/067/063) 790-99-00, Viber and Telegram chatbots.

We are working 24/7 to ensure reliable power supply of buildings and enterprises.

17 August 2026
Thermal power generation DTEK Grids DSO restored electricity to 900,000 homes in three regions over the course of the week
14 August 2026
Thermal power generation More than 2,700 green and distributed power generation facilities were connected over the course of six months, – DTEK Grids
13 August 2026
Thermal power generation 37 upgraded power facilities over six months: DTEK Grids DSO increased volumes of reconstruction and construction by 1.5 times
12 August 2026
Thermal power generation Energy workers of DTEK Dnipro Grids restored electricity to more than 26,000 families in the Dnipropetrovsk region over the course of two days
10 August 2026
Thermal power generation DTEK Grids DSO restored electricity to more than 1.2 mln homes in Donetsk, Odesa and Dnipropetrovsk regions over the course of the week
10 August 2026
Thermal power generation Electricity restored to almost 140,000 families in the Kyiv region: energy workers of DTEK Kyiv Regional Grids completed the restoration of the main grid after severe weather
07 August 2026
Thermal power generation In the first half of 2026, DTEK Grids DSO sent 777 tons of waste for recycling
05 August 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids power facilities: 126,000 residents of the Dnipropetrovsk region were left without electricity
04 August 2026
Thermal power generation Over the course of six months, DTEK Grids DSO restored 240 power facilities, damaged during hostilities
03 August 2026
Thermal power generation From platforms for nests to GPS trackers: DTEK Dnipro Grids began live tracking of stork migration