some-alt
Main News Press Releases DTEK Grids DSO restored electricity to more than 55,000 homes in Dnipropetrovsk, Donetsk and Kyiv regions over the course of the week

DTEK Grids DSO restored electricity to more than 55,000 homes in Dnipropetrovsk, Donetsk and Kyiv regions over the course of the week

Thermal power generation22 September 2025
Last week, energy workers of the DTEK Grids Distribution System Operators (DSO) were able to restore power to residents of 101 settlements, affected by enemy strikes, thus restoring electricity to homes of more than 55,000 families in Dnipropetrovsk, Donetsk and Kyiv regions. Specialists of the DTEK Grids DSO repair the grids immediately after obtaining permission from the AFU and the SES.

From September 15 to 21, energy workers were able to restore power to 45,100 homes in the Dnipropetrovsk region. The enemy is constantly shelling the Dnipropetrovsk region, regularly causing damage to the grids and power outages for the region’s residents. 

Last week, specialists in the Donetsk region, where the situation becomes increasingly difficult, managed to restore electricity to homes of 7,300 families of local residents. Despite constant danger, our energy workers continue to restore electricity in the region once it becomes possible. 

The Kyiv region continues to suffer from enemy attacks too. Last week, specialists of the energy company were able to restore electricity to 2,900 homes here. 

“The enemy does not stop attacking peaceful towns and villages of our country. Despite constant danger, energy workers continue to work and restore electricity for as long as 1,307 days now. Since the beginning of the full-scale invasion, we have already restored electricity to more than 21.6 mln* families in Kyiv, Dnipropetrovsk, Odesa and Donetsk regions, and in the city of Kyiv. Some settlements close to the area of hostilities had electricity restored to them on dozens of occasions,” – noted Alina Bondarenko, CEO at DTEK Grids.  

Energy workers of DTEK Grids DSO are doing everything possible to eliminate damage as soon as possible. They commence work immediately after obtaining permission and access to the site of damage from the AFU and SES. 

* considering that some customers had electricity restored to them on dozens of occasions. 

13 August 2026
Thermal power generation 37 upgraded power facilities over six months: DTEK Grids DSO increased volumes of reconstruction and construction by 1.5 times
12 August 2026
Thermal power generation Energy workers of DTEK Dnipro Grids restored electricity to more than 26,000 families in the Dnipropetrovsk region over the course of two days
10 August 2026
Thermal power generation DTEK Grids DSO restored electricity to more than 1.2 mln homes in Donetsk, Odesa and Dnipropetrovsk regions over the course of the week
10 August 2026
Thermal power generation Electricity restored to almost 140,000 families in the Kyiv region: energy workers of DTEK Kyiv Regional Grids completed the restoration of the main grid after severe weather
07 August 2026
Thermal power generation In the first half of 2026, DTEK Grids DSO sent 777 tons of waste for recycling
05 August 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids power facilities: 126,000 residents of the Dnipropetrovsk region were left without electricity
04 August 2026
Thermal power generation Over the course of six months, DTEK Grids DSO restored 240 power facilities, damaged during hostilities
03 August 2026
Thermal power generation From platforms for nests to GPS trackers: DTEK Dnipro Grids began live tracking of stork migration
29 July 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids unit in the Dnipropetrovsk region with a fibre optic drone
28 July 2026
Thermal power generation A third more: DTEK Grids DSO installed 136,000 smart meters over six months