some-alt
Main News Press Releases DTEK Grids DSO restored electricity to almost 139,000 homes after shelling in Donetsk, Dnipropetrovsk, Odesa and Kyiv regions over the course of the week

DTEK Grids DSO restored electricity to almost 139,000 homes after shelling in Donetsk, Dnipropetrovsk, Odesa and Kyiv regions over the course of the week

From July 7 to 13, energy workers of the DTEK Grids Distribution System Operators (DSO) were able to completely or partially restore power to 99 settlements, thus restoring electricity to homes of almost 139,000 families in Donetsk, Dnipropetrovsk, Odesa and Kyiv regions. Specialists of the DTEK Grids Distribution System Operators repair the grids immediately after obtaining permission from the AFU and the SES.

Last week, specialists in the Donetsk region, where heavy fighting is still ongoing, managed to restore electricity to homes of more than 58,100 families of local residents. Despite constant danger, our energy workers continue to restore electricity in the frontline region once it becomes possible. 

From July 7 to 13, energy workers in the Dnipropetrovsk region, in their turn, were able to restore power supply to 56,600 homes. The enemy continues to attack the Dnipropetrovsk region, thus regularly damaging grids and leaving residents of the region without electricity. 

Kyiv region also continues to suffer from enemy attacks. Here, specialists of the energy company were able to restore electricity to 23,800 homes last week. 

The enemy does not stop attacking Odesa region, too: energy workers here restored electricity to 251 homes, de-energized due to enemy attacks last week. 

“Despite constant security challenges, energy workers continue to repair power facilities, damaged by the enemy, for as long as 1,237 days now. Since the beginning of the full-scale invasion, we have already restored electricity to 19.8 mln* families in Kyiv, Dnipropetrovsk, Odesa and Donetsk regions, and in the city of Kyiv. Some settlements close to the area of hostilities had electricity restored to them on dozens of occasions,” – noted Alina Bondarenko, CEO at DTEK Grids.  

Energy workers of DTEK Grids are doing everything possible to eliminate damage as soon as possible. They commence work immediately after obtaining permission and access to the site of damage from the AFU and SES. 

* considering that some customers had electricity restored to them on dozens of occasions. 

14 August 2026
Thermal power generation More than 2,700 green and distributed power generation facilities were connected over the course of six months, – DTEK Grids
13 August 2026
Thermal power generation 37 upgraded power facilities over six months: DTEK Grids DSO increased volumes of reconstruction and construction by 1.5 times
12 August 2026
Thermal power generation Energy workers of DTEK Dnipro Grids restored electricity to more than 26,000 families in the Dnipropetrovsk region over the course of two days
10 August 2026
Thermal power generation DTEK Grids DSO restored electricity to more than 1.2 mln homes in Donetsk, Odesa and Dnipropetrovsk regions over the course of the week
10 August 2026
Thermal power generation Electricity restored to almost 140,000 families in the Kyiv region: energy workers of DTEK Kyiv Regional Grids completed the restoration of the main grid after severe weather
07 August 2026
Thermal power generation In the first half of 2026, DTEK Grids DSO sent 777 tons of waste for recycling
05 August 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids power facilities: 126,000 residents of the Dnipropetrovsk region were left without electricity
04 August 2026
Thermal power generation Over the course of six months, DTEK Grids DSO restored 240 power facilities, damaged during hostilities
03 August 2026
Thermal power generation From platforms for nests to GPS trackers: DTEK Dnipro Grids began live tracking of stork migration
29 July 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids unit in the Dnipropetrovsk region with a fibre optic drone