some-alt
Main News Press Releases DTEK restored electricity to more than a thousand residents of the Odessa region, who suffered from shelling

DTEK restored electricity to more than a thousand residents of the Odessa region, who suffered from shelling

On the night of July 18-19, the enemy launched missiles strikes on the Odessa region, which damaged electrical infrastructure, leaving about 2,000 families without electricity. DTEK Odessa Grids emergency and restoration crews commenced repair of damaged grids as soon as they got a permit from the AFU. By the morning, energy workers managed to restore power to more than 1,000 families. Elimination of consequences of missile strikes on the grids is ongoing.

Missile strikes on the Odessa region caused damage to power lines and electrical equipment, thus leaving residents of one of the region’s settlements without electricity. Prompt actions of the DTEK Odessa Grids repair crews, who started repairing grids immediately after obtaining a permit from the Armed Forces of Ukraine, helped restore electricity to 1,022 families by the morning of July 19. Currently, 950 homes remain without electricity. Energy workers are putting maximum effort to promptly repair damaged grids and restore electricity to all residents of the region, who were left without it.

Overall, there have been 16 cases of electrical infrastructure destruction in the Odessa region since the beginning of a full-scale armed attack on the territory of Ukraine. Shelling caused damage to 33 grids facilities, 2 administrative buildings of the Distribution System Operator, 68 electrical meters, etc. In total, since February 24 DTEK Odessa Grids energy workers have restored electricity to more than 26,000 families in the Odessa region.

Emergency and restoration crews continue to work 24/7 in order to promptly restore electricity to the homes of customers after emergencies, including due to shelling. The company cooperates with the Territorial Defense Forces and the Armed Forces of Ukraine in order to access the sites of damage. Additionally, employees have specific guidelines related to working in emergencies and are provided with everything needed to restore operation of equipment in case of hostilities upon obtaining permits from the Armed Forces of Ukraine.

Let us recall that in case of any questions you can use remote service channels: official DTEK Odessa Grids pages in Facebook and Instagram, Viber and Telegram chatbots, DTEK Odessa Grids website and IVR menu of the call center:

  • for stationary phones +38 (048) 705 90 90;
  • for mobile phones +38 (068) 750 90 90, +38 (095) 750 90 90, +38 (073) 750 90 90;

Please use official communication and information channels only and stay calm. We are working 24/7 to ensure reliable power supply of houses and enterprises.

17 August 2026
Thermal power generation DTEK Grids DSO restored electricity to 900,000 homes in three regions over the course of the week
14 August 2026
Thermal power generation More than 2,700 green and distributed power generation facilities were connected over the course of six months, – DTEK Grids
13 August 2026
Thermal power generation 37 upgraded power facilities over six months: DTEK Grids DSO increased volumes of reconstruction and construction by 1.5 times
12 August 2026
Thermal power generation Energy workers of DTEK Dnipro Grids restored electricity to more than 26,000 families in the Dnipropetrovsk region over the course of two days
10 August 2026
Thermal power generation DTEK Grids DSO restored electricity to more than 1.2 mln homes in Donetsk, Odesa and Dnipropetrovsk regions over the course of the week
10 August 2026
Thermal power generation Electricity restored to almost 140,000 families in the Kyiv region: energy workers of DTEK Kyiv Regional Grids completed the restoration of the main grid after severe weather
07 August 2026
Thermal power generation In the first half of 2026, DTEK Grids DSO sent 777 tons of waste for recycling
05 August 2026
Thermal power generation The enemy attacked DTEK Dnipro Grids power facilities: 126,000 residents of the Dnipropetrovsk region were left without electricity
04 August 2026
Thermal power generation Over the course of six months, DTEK Grids DSO restored 240 power facilities, damaged during hostilities
03 August 2026
Thermal power generation From platforms for nests to GPS trackers: DTEK Dnipro Grids began live tracking of stork migration